Monitor riser
A load-bearing riser sized to your desk, your screen and your seated eye height, so the top of the display lands where your neck stops working.
Configure
Order today and it arrives around 23 September.
Or €119 in 37 days on the batch lane.
| Deck | Made to order | CNC panel routing (2.5D) |
|---|---|---|
| Legs | Made to order | CNC panel routing (2.5D) |
| Delivered | Assembled | 6 min of assembly included |
| Rise height | 112 mm | 60–210 mm |
|---|---|---|
| Deck width | 560 mm | 320–900 mm |
| Deck depth | 240 mm | 180–340 mm |
| Deck thickness | 18 mm | 12–32 mm |
| Design load | 12 kg | 4–40 kg |
| Deflection at design load | 0.1 mm | target ≤ 1.5 |
|---|---|---|
| Unsupported span | 437 mm | |
| Screen centre above desk | 302 mm |
| Leg tenon into deck | Ø20 H9/d9 | clearance 0.0598–0.1644 mm · needs a secondary operation |
|---|
Buildable as specified
- Leg tenon into deck needs a secondary operation
H9/d9 at Ø20 mm asks for a tolerance the as-moulded process does not hold. Wood moves with humidity; a d9 shaft keeps the joint assemblable in a Shenzhen summer and a Berlin winter.
→ Specify reaming or facing after the primary operation, and state it on the drawing.
- Wood moves between the factory and the customer
A container crossing from 80% humidity in Guangdong to 35% in a heated European flat moves timber by up to 0.3% across the grain.
→ Specify 8–10% equilibrium moisture content at packing, seal all six faces, and never constrain the panel across the grain.
- Speed is most of what you are paying for
Air freight is €66.1 of a €133.74 landed cost — 49% of it. This part is heavy enough that flying it costs more than making it.
→ The same configuration by sea takes about 37 working days and cuts the freight to roughly a fiftieth.
Cost breakdown, per unit across a run of 1
| Material | €23.78 | |
|---|---|---|
| Process | €4.63 | |
| Components | €2.22 | 3 |
| Assembly | €0.32 | |
| Tooling, amortised | €30 | |
| Scrap allowance | €3.66 | |
| Freight + handling | €66.1 | |
| Import duty | €3.04 | |
| Landed cost | €133.74 | before margin and VAT |
What is fixed, and what is yours
The parameters above move; the components do not. Every unit uses the same released bill of materials, from the same certified suppliers, because changing the electronics means repeating the certification — expensive, slow, and invisible to you. The freedom is in the geometry, which is the part you actually see and touch.
deck and legs are made for your order by cnc panel routing (2.5d). That split is the whole reason this can arrive in 7 working days instead of six weeks.
Bill of materials
| Component | Supplier | Certification | Lead |
|---|---|---|---|
| Self-adhesive felt pads | Standard | — | 20 d |
| Cable clips, pair | Standard | — | 20 d |
| Flatpack carton with inserts | Local printer | FSC | 25 d |
Compliance
This product class triggers 1 regulatory regime. We are the manufacturer under EU law even though the factory is in China, so the declaration of conformity and the technical file are ours to hold — and to show you.
| Trigger | Legal basis | Standards |
|---|---|---|
| Load bearing | General Product Safety Regulation (EU) 2023/988 | EN 12521 / EN 1730 where furniture-adjacent, In-house static + fatigue protocol |