Powered hardware · SLS 3D printing

Bedside night light

An amber, 1800 K bedside light that stays under the melatonin-suppression threshold, so a 3 a.m. walk to the bathroom does not cost you the rest of your night.

Configure

Order today and it arrives around 24 September.

It contains a lithium cell. Shipped assembled, the cell travels as UN3481 (contained in equipment); loose in a kit it becomes UN3480, which is not carried by express air at this volume.

84per unit, incl. VAT · 8 working days
Reserve this build
Generated specificationrev NIG-13P6R3C
8 working daysMade for your order · Air express, customs cleared

Or €69 in 38 days on the batch lane.

96 × 96 × 88 mmBounding box
147 gMass
PA12 + 30% glass fibreSLS 3D printing
84incl. VAT, from35.56
Parts — what is stocked and what is made for you
BodyMade to orderSLS 3D printing
Diffuser domeMade to orderSLS 3D printing
DeliveredAssembled11 min of assembly included
Parameters
Dome diameter96 mm60–160 mm
Body height88 mm50–180 mm
Wall thickness1.8 mm1.2–3.2 mm
Maximum output184–60
Computed
Melanopic lux at 1 m2target ≤ 3
Runtime at full output (hours)81
Tip-over angle44.8 degtarget ≥ 18
Fits and tolerances — ISO 286, general dimensions ISO 2768-m0.3 mm)
Dome onto bodyØ90 H9/d9clearance 0.11590.2897 mm · needs a secondary operation
58Manufacturability
Buildable as specified
  • Dome onto body needs a secondary operation

    H9/d9 at Ø90 mm asks for a tolerance the as-moulded process does not hold. Snap-free push fit that survives 500 open/close cycles for the battery; tighter and the dome scuffs.

    Specify reaming or facing after the primary operation, and state it on the drawing.

  • Built in PA12 + 30% glass fibre, not ABS

    SLS 3D printing cannot run ABS. On this lane the part is PA12 + 30% glass fibre: 1.35 g/cm³ against 1.05, and 110 MPa against 42. The surface is different too — printed parts have a fine matte grain that a moulded part does not.

    Order on the batch lane to get ABS as specified.

  • Speed is most of what you are paying for

    Air freight is €13.87 of a €35.56 landed cost — 39% of it. This part is heavy enough that flying it costs more than making it.

    The same configuration by sea takes about 38 working days and cuts the freight to roughly a fiftieth.

  • The moulded version carries draft the printed one does not

    Body prints without draft on the express lane, but injection molding needs 1° on every face parallel to the pull. Over a 90 mm wall that moves the surface by about 1.6 mm.

    If the two must be interchangeable, design with draft from the start and accept it on the printed part too.

  • Ships assembled — not a choice we make

    It contains a lithium cell. Shipped assembled, the cell travels as UN3481 (contained in equipment); loose in a kit it becomes UN3480, which is not carried by express air at this volume.

Cost breakdown, per unit across a run of 1
Material1
Process7.84
Components10.117
Assembly0.59
Tooling, amortised0
Scrap allowance1.17
Freight + handling13.87
Import duty0.97
Landed cost35.56before margin and VAT

What is fixed, and what is yours

The parameters above move; the components do not. Every unit uses the same released bill of materials, from the same certified suppliers, because changing the electronics means repeating the certification — expensive, slow, and invisible to you. The freedom is in the geometry, which is the part you actually see and touch.

body and diffuser dome are made for your order by sls 3d printing. That split is the whole reason this can arrive in 8 working days instead of six weeks.

Bill of materials

ComponentSupplierCertificationLead
Amber LED module 1800 KNichiaIEC 62471 RG0, RoHS30 d
USB-C sink + boost driver, 5 WInjoinicUSB-IF, RoHS35 d
18650 cell, 2600 mAhSamsung SDI (alt: LG)IEC 62133-2, UN 38.335 d
1S protection boardSeiko/ABLICRoHS25 d
USB-C cable 2 m, braidedSinowellUSB-IF, RoHS25 d
Silicone foot ringStandardREACH, LFGB25 d
Rigid gift box, FSC boardLocal printerFSC25 d

Compliance

This product class triggers 3 regulatory regimes. We are the manufacturer under EU law even though the factory is in China, so the declaration of conformity and the technical file are ours to hold — and to show you.

TriggerLegal basisStandards
USB powered (SELV)EMC 2014/30/EU (SELV, so LVD does not apply below 50 V AC / 75 V DC)EN 55032 Class B, EN 55035, EN IEC 63000 (RoHS)
LED light sourceEcodesign (EU) 2019/2020 + Energy Labelling (EU) 2019/2015 for separately sold light sourcesIEC 62471 (photobiological safety), EN 62493
Lithium-ion cellBattery Regulation (EU) 2023/1542 + UN Model RegulationsIEC 62133-2, UN 38.3