Passive hardware · CNC turning + Cut to length from stock + SLS 3D printing

Headphone stand

A cantilevered stand with a yoke radius matched to your headband, so the padding keeps its shape instead of creasing over a thin hook.

Configure

Order today and it arrives around 24 September.

99per unit, incl. VAT · 8 working days
Reserve this build
Generated specificationrev HEA-0E4JD2U
8 working daysMade for your order · Air express, customs cleared

Or €54 in 38 days on the batch lane.

186 × 128 × 285 mmBounding box
676 gMass
Aluminium 6061-T6Cut to length from stock
99incl. VAT, from43.52
Parts — what is stocked and what is made for you
Turned baseStockedCNC turning
PostMade to orderCut to length from stock
YokeMade to orderSLS 3D printing
DeliveredAssembled5 min of assembly included
Parameters
Stand height285 mm200–400 mm
Yoke radius34 mm18–60 mm
Base diameter128 mm90–190 mm
Arm offset58 mm20–110 mm
Computed
Tip-over angle with 400 g headphones10.9 degtarget ≥ 10
Headband contact arc82 mmtarget ≥ 60
Fits and tolerances — ISO 286, general dimensions ISO 2768-m0.5 mm)
Post into baseØ18 H7/g6clearance 0.00670.0348 mm · needs a secondary operation
73Manufacturability
Buildable as specified
  • Post into base needs a secondary operation

    H7/g6 at Ø18 mm asks for a tolerance the as-moulded process does not hold. Cantilevered load: any slop here becomes visible lean at the yoke.

    Specify reaming or facing after the primary operation, and state it on the drawing.

  • Speed is most of what you are paying for

    Air freight is €23.55 of a €43.52 landed cost — 54% of it. This part is heavy enough that flying it costs more than making it.

    The same configuration by sea takes about 38 working days and cuts the freight to roughly a fiftieth.

  • The moulded version carries draft the printed one does not

    Yoke prints without draft on the express lane, but injection molding needs 1° on every face parallel to the pull. Over a 90 mm wall that moves the surface by about 1.6 mm.

    If the two must be interchangeable, design with draft from the start and accept it on the printed part too.

Cost breakdown, per unit across a run of 1
Material5.23
Process10.62
Components1.843
Assembly0.27
Tooling, amortised0.03
Scrap allowance1.08
Freight + handling23.55
Import duty0.9
Landed cost43.52before margin and VAT

What is fixed, and what is yours

The parameters above move; the components do not. Every unit uses the same released bill of materials, from the same certified suppliers, because changing the electronics means repeating the certification — expensive, slow, and invisible to you. The freedom is in the geometry, which is the part you actually see and touch.

The parts that do not change — turned base — are made in volume and held in stock, so their tooling is spread over every configuration we sell and their lead time is zero. post and yoke are made for your order by cut to length from stock. That split is the whole reason this can arrive in 8 working days instead of six weeks.

Bill of materials

ComponentSupplierCertificationLead
TPU liner strip, adhesive backedStandardREACH25 d
Self-adhesive felt padsStandard20 d
Rigid gift box, FSC boardLocal printerFSC25 d