Passive hardware · Sheet metal (laser + brake)

Under-desk cable tray

A clamp-on tray cut to your desk’s exact top thickness, so it holds a power strip and a laptop brick without a single screw in the desk.

Configure

Order today and it arrives around 25 September.

399per unit, incl. VAT · 9 working days
Reserve this build
Generated specificationrev CAB-09W8ELG
9 working daysMade for your order · Air express, customs cleared

Or €59 in 39 days on the batch lane.

480 × 160 × 95 mmBounding box
1.2 kgMass
Stainless steel 304Sheet metal (laser + brake)
399incl. VAT, from191.68
Parts — what is stocked and what is made for you
TrayMade to orderSheet metal (laser + brake)
DeliveredAssembled3 min of assembly included
Parameters
Tray length480 mm250–900 mm
Tray depth120 mm80–200 mm
Tray height70 mm40–120 mm
Desk top thickness25 mm12–45 mm
Sheet thickness1.5 mm0.8–2.5 mm
Computed
Minimum bend radius1.5 mm
Rated load81 kgtarget ≥ 4
Usable volume (cm³)4032
Fits and tolerances — ISO 286, general dimensions ISO 2768-m0.8 mm)
Clamp openingØ25 H11/h11clearance 00.2615 mm
97Manufacturability
Buildable as specified
  • Below the economic run size for this process

    Sheet metal (laser + brake) carries €120 of tooling. We amortise it over the committed run of 1,000, so a single unit still prices at €0.12 of tooling — but the run has to happen.

    Run this one on CNC or SLS and keep the tooling for the production batch.

Cost breakdown, per unit across a run of 1
Material6.99
Process5.8
Components2.744
Assembly0.16
Tooling, amortised120
Scrap allowance8.14
Freight + handling41.09
Import duty6.76
Landed cost191.68before margin and VAT

What is fixed, and what is yours

The parameters above move; the components do not. Every unit uses the same released bill of materials, from the same certified suppliers, because changing the electronics means repeating the certification — expensive, slow, and invisible to you. The freedom is in the geometry, which is the part you actually see and touch.

tray is made for your order by sheet metal (laser + brake). That split is the whole reason this can arrive in 9 working days instead of six weeks.

Bill of materials

ComponentSupplierCertificationLead
TPE clamp pads, pairStandardREACH25 d
M6 thumb screw, stainlessStandardRoHS20 d
Cable clips, pairStandard20 d
Flatpack carton with insertsLocal printerFSC25 d

Compliance

This product class triggers 1 regulatory regime. We are the manufacturer under EU law even though the factory is in China, so the declaration of conformity and the technical file are ours to hold — and to show you.

TriggerLegal basisStandards
Load bearingGeneral Product Safety Regulation (EU) 2023/988EN 12521 / EN 1730 where furniture-adjacent, In-house static + fatigue protocol